September 22, 2016: Acoustic ceiling and gable window with air vent in a Preschool classroom.


Progress continues at a cracking pace on our new campus. Work on settling the landscape continues. The acoustic ceilings are all painted and complete in the Preschool, Lower and Upper Primary blocks. Most of the fixed laminated glass windows have now been installed in the classrooms, with the sliding windows going in. Doors are also being installed.

Stone continues to be placed on the Admin and Infant Community blocks, where the internal walls, ceilings, and electrics are also in progress.

The recent rain slowed the landscape work a little, but was a good opportunity for us to see how the site functions in the wet. While we have a lot to do, progress is good and we’re still on track for moving at the beginning of term 3.

 img_6411

September 22, 2016: A worker touching up the facade of a Preschool classroom. The benches on the verandas will have lids and be used for storage.

 img_6449


September 22, 2016: Landscaping continuing in front of the Lower Primary block, with the Admin (left) and Infant Community (centre) in the background.

 img_6428


September 22, 2016: View from the principal’s office upstairs in the Admin building, showing landscape work in progress in front of the Lower and Upper Primary classroom blocks.

 img_6422


 September 22, 2016: Work continuing on the second floor of the Admin block.

 img_6419


 September 22, 2016: The Infant Community building, next to Admin.

 img_6456

September 22, 2016: Joinery continuing in the Infant Community room: