New Campus Update: July 29, 2016

29 Jul 2016

July 29, 2016: Work progresses on the roadside gable end of the Preschool block.

Work is progressing on the fascias, gable windows, and classroom and veranda ceilings.

 img_7670

July 29,2016: The acoustic ceiling in a Preschool class, with work underway on the gable window.

 img_7595

July 29, 2016: The Preschool block veranda. The outside ceiling has now been installed.

 img_7672


July 29, 2016: Fascias on the Preschool block.

img_6409


July 29, 2016: Work continuing on the second floor of the Admin building.